PVC Conduit Fill Chart: Schedule 40 vs. Schedule 80
NEC 2026 PVC conduit fill chart comparing Schedule 40 (Table C.11) vs. Schedule 80 (Table C.10) for THWN-2 & XHHW-2.
| Wire Size | Wire Area (Table 5) | Sch 40 Max (C.11) | Sch 80 Max (C.10) | Sch 80 Delta |
|---|---|---|---|---|
| 14 AWG | 0.0097 in² | 21 | 17 | -4 |
| 12 AWG | 0.0133 in² | 15 | 12 | -3 |
| 10 AWG | 0.0211 in² | 9 | 7 | -2 |
| 8 AWG | 0.0366 in² | 5 | 4 | -1 |
| 6 AWG | 0.0507 in² | 4 | 3 | -1 |
| 4 AWG | 0.0824 in² | 2 | 1 | -1 |
| 3 AWG | 0.0973 in² | 1 | 1 | 0 |
| 2 AWG | 0.1158 in² | 1 | 1 | 0 |
| 1 AWG | 0.1562 in² | 1 | 1 | 0 |
| 1/0 AWG | 0.1855 in² | 1 | 1 | 0 |
| 2/0 AWG | 0.2223 in² | 1 | 1 | 0 |
| 3/0 AWG | 0.2679 in² | 1 | 1 | 0 |
| 4/0 AWG | 0.3237 in² | 1 | 0 | -1 |
| 250 kcmil | 0.3970 in² | 0 | 0 | 0 |
| 300 kcmil | 0.4608 in² | 0 | 0 | 0 |
| 350 kcmil | 0.5242 in² | 0 | 0 | 0 |
| 400 kcmil | 0.5863 in² | 0 | 0 | 0 |
| 500 kcmil | 0.7073 in² | 0 | 0 | 0 |
NEC Chapter 9 Table 4: PVC Schedule 40 vs. Schedule 80 Bore Dimensions
Exact internal diameter (ID), 100% bore area, and 40% (3+ wire) fill budget from 1/2" through 4" rigid PVC conduit. Because underground trench runs often exceed 100 ft, check long-run conductor upsizing in the NEC Voltage Drop Calculator before purchasing PVC conduit.
| Trade Size | Sch 40 ID | Sch 40 Area | Sch 40 (40%) | Sch 80 ID | Sch 80 Area | Sch 80 (40%) | Area Loss |
|---|---|---|---|---|---|---|---|
| 1/2" PVC | 0.602" | 0.285 in² | 0.114 in² | 0.526" | 0.217 in² | 0.087 in² | -23.9% |
| 3/4" PVC | 0.804" | 0.508 in² | 0.203 in² | 0.722" | 0.409 in² | 0.164 in² | -19.5% |
| 1" PVC | 1.029" | 0.832 in² | 0.333 in² | 0.936" | 0.688 in² | 0.275 in² | -17.3% |
| 1-1/4" PVC | 1.360" | 1.453 in² | 0.581 in² | 1.255" | 1.237 in² | 0.495 in² | -14.9% |
| 1-1/2" PVC | 1.590" | 1.986 in² | 0.794 in² | 1.476" | 1.711 in² | 0.684 in² | -13.8% |
| 2" PVC | 2.047" | 3.291 in² | 1.316 in² | 1.913" | 2.874 in² | 1.150 in² | -12.7% |
| 2-1/2" PVC | 2.445" | 4.695 in² | 1.878 in² | 2.290" | 4.119 in² | 1.648 in² | -12.3% |
| 3" PVC | 3.042" | 7.268 in² | 2.907 in² | 2.864" | 6.442 in² | 2.577 in² | -11.4% |
| 3-1/2" PVC | 3.521" | 9.737 in² | 3.895 in² | 3.326" | 8.688 in² | 3.475 in² | -10.8% |
| 4" PVC | 3.998" | 12.554 in² | 5.022 in² | 3.786" | 11.258 in² | 4.503 in² | -10.3% |
Full NEC Table C.11 (PVC Sch 40) & Table C.10 (PVC Sch 80) — THHN/THWN-2
Complete printable matrices for underground and exposed PVC conduit sizing based on NFPA 70 (NEC) Article 352. Underground PVC is classified as a wet location (NEC 300.5(B))—conductors must carry wet-location listings such as THWN-2 or XHHW-2, never dry-only THHN.
| Wire Size | 1/2" | 3/4" | 1" | 1-1/4" | 1-1/2" | 2" | 2-1/2" | 3" | 3-1/2" | 4" |
|---|---|---|---|---|---|---|---|---|---|---|
| 14 AWG | 11 | 21 | 34 | 60 | 82 | 135 | 193 | 299 | 401 | 517 |
| 12 AWG | 8 | 15 | 25 | 43 | 59 | 99 | 141 | 218 | 293 | 377 |
| 10 AWG | 5 | 9 | 15 | 27 | 37 | 62 | 89 | 137 | 184 | 238 |
| 8 AWG | 3 | 5 | 9 | 16 | 21 | 36 | 51 | 79 | 106 | 137 |
| 6 AWG | 1 | 4 | 6 | 11 | 15 | 26 | 37 | 57 | 77 | 99 |
| 4 AWG | 1 | 2 | 4 | 7 | 9 | 16 | 22 | 35 | 47 | 61 |
| 3 AWG | 1 | 1 | 3 | 6 | 8 | 13 | 19 | 30 | 40 | 51 |
| 2 AWG | 1 | 1 | 3 | 5 | 7 | 11 | 16 | 25 | 33 | 43 |
| 1 AWG | 1 | 1 | 1 | 3 | 5 | 8 | 12 | 18 | 25 | 32 |
| 1/0 AWG | 1 | 1 | 1 | 3 | 4 | 7 | 10 | 15 | 21 | 27 |
| 2/0 AWG | 0 | 1 | 1 | 2 | 3 | 6 | 8 | 13 | 17 | 22 |
| 3/0 AWG | 0 | 1 | 1 | 1 | 3 | 5 | 7 | 11 | 14 | 18 |
| 4/0 AWG | 0 | 1 | 1 | 1 | 2 | 4 | 6 | 9 | 12 | 15 |
| 250 kcmil | 0 | 0 | 1 | 1 | 1 | 3 | 4 | 7 | 10 | 12 |
| 300 kcmil | 0 | 0 | 1 | 1 | 1 | 3 | 4 | 6 | 8 | 11 |
| 350 kcmil | 0 | 0 | 1 | 1 | 1 | 2 | 3 | 5 | 7 | 9 |
| 400 kcmil | 0 | 0 | 0 | 1 | 1 | 1 | 3 | 5 | 6 | 8 |
| 500 kcmil | 0 | 0 | 0 | 1 | 1 | 1 | 2 | 4 | 5 | 7 |
| Wire Size | 1/2" | 3/4" | 1" | 1-1/4" | 1-1/2" | 2" | 2-1/2" | 3" | 3-1/2" | 4" |
|---|---|---|---|---|---|---|---|---|---|---|
| 14 AWG | 9 | 17 | 28 | 51 | 70 | 118 | 170 | 265 | 358 | 464 |
| 12 AWG | 6 | 12 | 20 | 37 | 51 | 86 | 124 | 193 | 261 | 338 |
| 10 AWG | 4 | 7 | 13 | 23 | 32 | 54 | 78 | 122 | 164 | 213 |
| 8 AWG | 2 | 4 | 7 | 13 | 18 | 31 | 45 | 70 | 95 | 123 |
| 6 AWG | 1 | 3 | 5 | 9 | 13 | 22 | 32 | 51 | 68 | 89 |
| 4 AWG | 1 | 1 | 3 | 6 | 8 | 14 | 20 | 31 | 42 | 54 |
| 3 AWG | 1 | 1 | 3 | 5 | 7 | 12 | 17 | 26 | 35 | 46 |
| 2 AWG | 1 | 1 | 2 | 4 | 6 | 10 | 14 | 22 | 30 | 39 |
| 1 AWG | 0 | 1 | 1 | 3 | 4 | 7 | 10 | 16 | 22 | 29 |
| 1/0 AWG | 0 | 1 | 1 | 2 | 3 | 6 | 9 | 14 | 18 | 24 |
| 2/0 AWG | 0 | 1 | 1 | 1 | 3 | 5 | 7 | 11 | 15 | 20 |
| 3/0 AWG | 0 | 1 | 1 | 1 | 2 | 4 | 6 | 9 | 13 | 17 |
| 4/0 AWG | 0 | 0 | 1 | 1 | 1 | 3 | 5 | 8 | 10 | 14 |
| 250 kcmil | 0 | 0 | 1 | 1 | 1 | 3 | 4 | 6 | 8 | 11 |
| 300 kcmil | 0 | 0 | 0 | 1 | 1 | 2 | 3 | 5 | 7 | 9 |
| 350 kcmil | 0 | 0 | 0 | 1 | 1 | 1 | 3 | 5 | 6 | 8 |
| 400 kcmil | 0 | 0 | 0 | 1 | 1 | 1 | 3 | 4 | 6 | 7 |
| 500 kcmil | 0 | 0 | 0 | 1 | 1 | 1 | 2 | 3 | 5 | 6 |
Field Questions & NEC Notes
Why does PVC Schedule 80 hold fewer conductors than Schedule 40 of the same trade size?
Both Schedule 40 and Schedule 80 PVC share the exact same outside diameter (OD) so they fit identical couplings, hubs, and fittings. To achieve Schedule 80's heavier wall thickness for impact resistance, the extra plastic is added inward—shrinking internal cross-sectional area by 10% to 24% depending on trade size (for 1/2" PVC, Sch 80 loses 23.9% of internal area).
Where does the NEC require Schedule 80 PVC instead of Schedule 40?
Under NEC 352.10(F) and NEC 300.5(D)(4), Schedule 80 PVC is required wherever rigid PVC conduit is subject to physical damage—most commonly on above-grade risers emerging from underground trenches up to 8 feet above grade (such as meter risers, detached garage stubs, and commercial exterior stubs).
If I run underground in Schedule 40 and stub up in Schedule 80, which fill table governs the pull?
Schedule 80 (NEC Annex C Table C.10) governs the entire continuous raceway run because every conductor passes through the smaller Schedule 80 internal bore on the riser. Always size underground PVC feeders using Table C.10 whenever any portion of the run uses Schedule 80 risers.